2026-04-10

Crisis update: Oil spill Deurganckdock

An oil spill in the Deurganckdock is causing significant disruption in the port of Antwerp. We are closely monitoring the situation and will keep you informed on this page with the latest updates.

16/04/2026 13:15

The North Sea Terminal and the Europa Terminal are now fully cleared for use. 

The terminals in the Deurganckdok are  operational. Quay walls and ships are still being cleaned on part of the western side. 

Inland vessels are being cleaned at the Galgenschoor inland waterway jetty.
 

15/04/2026 08:00

The quay wall at Noordzee Terminals NZT is largely available and the terminal is operational.

 

Europa Terminal is not yet operational. Cleaning work is still underway on ships and on the quay wall.

 

Following the east side, the transverse quay and a section of the west side of Deurganck Dock are now also available again.

 

Inland vessels are still being cleaned at the Galgenschoor inland waterway jetty.
 

14/04/2026 10u15

The east side of the Deurganckdok is back in use. On the west side, cleaning work is still underway on the quay walls and on ships.

 

The North Sea Terminal is partially in use. The last ships are being cleaned there.

 

At the Europa Terminal, cleaning work is still underway on ships and the quay walls.

 

For inland shipping, the Lillo-Zuid waiting jetty is available again.

 

At the Galgenschoor and the cleaining work goes on.
 

13/04/2026 - 10u30

The Kieldrecht Lock has been partially reopened.

The Zandvliet and Berendrecht Locks are available again.

A number of berths at the Deurganck Dock are available. The soiled container ships in the dock are being cleaned.

The remaining cleaning work at terminals on both banks, on ships, at the Galgenschoor and at the Lillo jetty is continuing. We expect this work to take a few more days.

12/04/2026 - 19:00

The Kieldrecht Lock has been partially reopened. The first new container vessels entered the port today, and their number will increase as clean-up operations progress. Remaining cleaning operations at the terminals, on vessels, at Galgenschoor and the Lillo jetty are ongoing.

12/04/2026 - 08:00

Overnight and this morning, the first cleaned vessels departed from the container terminals. New vessels are expected to gradually arrive throughout the day. Cleaning operations on vessels, terminals, Galgenschoor and the Lillo jetty are still ongoing.

11/04/2026 - 21:00

Cleaning operations on vessels and infrastructure at the Deurganck Dock, the Noordzee Terminal and the Europaterminal are still ongoing. Intensive clean-up efforts are also continuing at Galgenschoor and the Lillo jetty.

11/04/2026 - 14:00

The Zandvliet lock has now been reopened, meaning all locks on the right bank are back in operation; the situation at the container terminals remains unchanged.

11/04/2026 - 08:30

The clean-up operations proceeded as planned overnight. Vessels in the Deurganck Dock continue to be cleaned so they can resume loading and unloading operations and depart once they are operationally ready.

On the right bank, the Berendrecht lock reopened overnight. The Zandvliet lock is not yet operational. The Boudewijn and Van Cauwelaert locks are operational. On the left bank, the Kallo lock is accessible.

Cleaning of contaminated vessels is also ongoing at the Noordzee and Europaterminal.

As for shipping traffic: currently, 18 vessels are planned or en route to Antwerp. A further 14 vessels are waiting to enter the port, while 23 vessels are waiting to depart.

The impact on the riverbanks along the Scheldt will be further assessed today, so that clean-up operations can also be initiated there where necessary.

10/04/2026 - 19:30

The Deurganckdock remains closed until further notice. On the right bank, the Boudewijn and Van Cauwelaert locks are operational again. On the left bank, the Kallo lock is accessible.

Our operational priority in the coming hours is to fully clear the Deurganckdock, the Noordzee and Europaterminal, and the Berendrecht-Zandvliet lock complex.

Currently, 29 outbound and 25 inbound vessels are waiting.

Together with Civil Protection and other relevant authorities, clean-up operations are ongoing in the Galgenschoor nature area. The impact on surrounding nature areas will be further assessed tomorrow morning.

Further updates will follow as soon as more information becomes available.

10/04/2026 - 13:30

Focus on resuming operations

  • The Scheldt has now been reopened to shipping. The Deurganck Dock, however, remains closed until further notice.
  • Specialised vessels are actively engaged in cleaning up the oil. Our operational priority is to fully clear the Deurganck Dock, the Noordzee and Europaterminal, and the Berendrecht-Zandvliet lock complex. We are making every effort to safely and swiftly resume operations at these key locations and to minimise and resolve disruptions.

Monitoring of riverbanks and nature

  • Together with Civil Protection, the Agency for Maritime and Coastal Services, and De Vlaamse Waterweg, the potential impact on riverbanks and surrounding nature areas is being closely monitored. The focus is on preventing further spread and on targeted clean-up of vulnerable zones.

How does a clean-up operation work?

  • Curious about the techniques and resources our teams are currently using to make the port safe again? Read more about how we clean up oil in the port.

Further updates will follow as soon as more information becomes available.

10/04/2026 - 07:30

Oil spill in the Deurganck Dock and the Scheldt: Operational Coordination activated

  • An oil spill occurred during a bunkering operation in the Deurganck Dock. Although the source has been stopped and the directly involved seagoing vessels have been contained for active clean-up operations, the pollution spread further towards the Scheldt overnight.

Impact on shipping and environment

  • The Scheldt is currently fully closed to traffic between buoy 80 (above Noordzeeterminal) and the entrance to the Deurganck Dock. The Zandvliet and Berendrecht locks are also closed due to the presence of oil slicks.
  • In addition to the source location, vessels at the Europaterminal, several inland vessels near the Galgenschoor area, and a tugboat have been affected. There is also a risk of impact on nearby nature areas.
  • As a result, the port is currently not accessible via the Scheldt.
  • We regret the impact of this incident on our port and the vulnerable nature areas along the Scheldt. Protecting our environment is an absolute priority, and we are doing everything possible to minimise both operational and ecological damage.

Escalation and response

  • To streamline coordination between all involved services, Operational Coordination has been activated in consultation with the Harbour Master. Emergency services are fully mobilised and are focusing on containment and clean-up operations.

Further communication

  • Updates will be shared on this website as soon as more information becomes available.